IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0058 # 09 Y:2024 09 2024 PAY BILLS ON TIME TO AVOID LATE FEES $613 $0 n/a
MU0058 # 08 Y:2024 08 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,637 $623 n/a
MU0058 # 07 Y:2024 07 2024 INSTALL TIMERS AND/OR THERMOSTATS $2,805 $870 n/a
MU0058 # 01 Y:2024 01 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $135 $370 n/a
MU0058 # 02 Y:2024 02 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $40,066 $1 n/a
MU0058 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $239 $34 n/a
MU0058 # 04 Y:2024 04 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $253 $0 n/a
MU0058 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $99 $118 n/a
MU0058 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,944 $1,620 n/a
MU0033 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $1,490 $18 Not Implemented
MU0033 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $814 $270 Not Implemented
MU0033 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,285 $5,918 Not Implemented
MU0033 # 04 Y:2023 04 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,201 $0 Not Implemented
MU0033 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $872 $524 Not Implemented
MU0019 # 02 Y:2022 02 2022 USE PHOTOCELL CONTROLS $386 $133 Not Implemented
MU0019 # 04 Y:2022 04 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,514 $610 Not Implemented
MU0019 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45,007 $800 Implemented
MU0019 # 01 Y:2022 01 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $306 $40 Not Implemented
UM0457 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $261,975 $300,000 Not Implemented
UM0457 # 03 Y:2015 03 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $154,545 $50,000 Not Implemented
UM0457 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $162,816 $1,000 Implemented
UM0435 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $966 $2,500 Implemented
UM0435 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,000 $3,000 Implemented
UM0435 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,500 $200 Not Implemented
UM0435 # 01 Y:2013 01 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,450 $4,500 Implemented