Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
191
matching recommendationsNAICS | 331 | Primary Metal Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0355 # 06 Y:2023 | 06 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $29,986 | $2,880 | Not Implemented |
MZ0355 # 07 Y:2023 | 07 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,043 | $320 | Implemented |
MZ0355 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $860 | $750 | Not Implemented |
MZ0355 # 02 Y:2023 | 02 | 2023 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $9,825 | $7,940 | Not Implemented |
MZ0355 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $60,563 | $285,000 | Not Implemented |
MZ0355 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,125 | $42,980 | Not Implemented |
MZ0355 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,922 | $78,200 | Not Implemented |
MZ0352 # 03 Y:2023 | 03 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,627 | $2,400 | Implemented |
MZ0352 # 08 Y:2023 | 08 | 2023 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $38,678 | $132,100 | Implemented |
MZ0352 # 09 Y:2023 | 09 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,760 | $3,671 | Implemented |
MZ0352 # 12 Y:2023 | 12 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $213,792 | $1,700,000 | Not Implemented |
MZ0352 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,256 | $56,316 | Implemented |
MZ0352 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,053 | $160 | Implemented |
MZ0352 # 11 Y:2023 | 11 | 2023 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $109,087 | $116,979 | Not Implemented |
MZ0352 # 07 Y:2023 | 07 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,709 | $750 | Implemented |
MZ0352 # 10 Y:2023 | 10 | 2023 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $49,532 | $3,900 | Implemented |
MZ0352 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,882 | $315 | Implemented |
MZ0352 # 04 Y:2023 | 04 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,502 | $320 | Implemented |
MZ0352 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,512 | $15,473 | Implemented |
MZ0319 # 09 Y:2021 | 09 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,480 | $3,480 | Not Implemented |
MZ0319 # 07 Y:2021 | 07 | 2021 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $22,855 | $145,659 | Not Implemented |
MZ0319 # 08 Y:2021 | 08 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,401 | $25,720 | Implemented |
MZ0319 # 02 Y:2021 | 02 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,278 | $240 | Implemented |
MZ0319 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $687 | $800 | Implemented |
MZ0319 # 03 Y:2021 | 03 | 2021 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $3,002 | $600 | Implemented |