IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

590

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1065 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,980 $2,457 n/a
UD1065 # 02 Y:2023 02 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,692 $430 n/a
UD1065 # 06 Y:2023 06 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $210 $741 n/a
UD1065 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $38,039 $0 n/a
UD1065 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $19,345 $19,667 n/a
UD1065 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,046 $952 n/a
UD1065 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $589 $0 n/a
UD1065 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,334 $3,051 n/a
CW0128 # 02 Y:2023 02 2023 ADOPT IN-HOUSE MATERIAL GENERATION $215,269 $246,950 n/a
CW0128 # 01 Y:2023 01 2023 UPGRADE CONTROLS ON COMPRESSORS $5,763 $4,760 n/a
CW0128 # 06 Y:2023 06 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,800 $26,211 n/a
CW0128 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,453 $225 n/a
CW0128 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $956 $400 n/a
CW0128 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $2,001 $8,583 n/a
CW0127 # 02 Y:2023 02 2023 UPGRADE CONTROLS ON COMPRESSORS $16,199 $33,933 n/a
CW0127 # 05 Y:2023 05 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $10,872 $33,000 n/a
CW0127 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,576 $56,000 n/a
CW0127 # 03 Y:2023 03 2023 RECYCLE CASTING SAND $414,227 $38,394 n/a
CW0127 # 06 Y:2023 06 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $9,906 $19,900 n/a
CW0127 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,943 $21,648 n/a
UD1040 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,896 $453 Not Implemented
UD1040 # 04 Y:2022 04 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $78,304 $700 Not Implemented
UD1040 # 05 Y:2022 05 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $146,536 $40,000 Not Implemented
UD1040 # 01 Y:2022 01 2022 COVER OPEN TANKS $3,104 $0 Not Implemented
UD1040 # 03 Y:2022 03 2022 REDUCE VENTILATION AIR $8,723 $0 Not Implemented