IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

204

matching recommendations
Reset
NAICS 3311 Iron and Steel Mills and Ferroalloy Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0034 # 06 Y:2024 06 2024 APPLY FOR INVESTMENT INCENTIVES $3,553 $5,000 n/a
NT0034 # 05 Y:2024 05 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,461 $1,258 n/a
NT0034 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $131 $414 n/a
NT0034 # 02 Y:2024 02 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $249 $0 n/a
NT0034 # 07 Y:2024 07 2024 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $30,115 $80,000 n/a
NT0034 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,552 $19,950 n/a
NT0034 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,040 $1,056 n/a
UL2307 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,752 $14,626 Not Implemented
UL2307 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $38,660 $22,666 Not Implemented
UL2307 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $38,855 $480,889 Not Implemented
UL2307 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,654 $33,973 Implemented
UL2307 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,100 $2,693 Implemented
UL2307 # 07 Y:2023 07 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $36,790 $34,740 Implemented
UL2307 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,834 $0 Not Implemented
UL2307 # 08 Y:2023 08 2023 RECOVER WASTE HEAT FROM EQUIPMENT $46,192 $39,000 Not Implemented
CW0128 # 06 Y:2023 06 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,800 $26,211 n/a
CW0128 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,453 $225 n/a
CW0128 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $2,001 $8,583 n/a
CW0128 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $956 $400 n/a
CW0128 # 02 Y:2023 02 2023 ADOPT IN-HOUSE MATERIAL GENERATION $215,269 $246,950 n/a
CW0128 # 01 Y:2023 01 2023 UPGRADE CONTROLS ON COMPRESSORS $5,763 $4,760 n/a
SD0624 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,715 $1,161 Implemented
SD0624 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,290 $1,500 Implemented
SD0624 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $998 $4,300 Not Implemented
SD0624 # 03 Y:2023 03 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,718 $11,910 Not Implemented