IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,035

matching recommendations
Reset
NAICS 3312 Steel Product Manufacturing from Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0800 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,775 $10,104 n/a
OR0800 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,219 $9,036 n/a
OR0800 # 01 Y:2024 01 2024 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $5,407 $0 n/a
OR0800 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $77,631 $300,000 n/a
TT0322 # 04 Y:2025 04 2025 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $7,760 $15,000 n/a
TT0322 # 01 Y:2025 01 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $473 $60 n/a
TT0322 # 05 Y:2025 05 2025 USE SOLAR HEAT FOR HEAT $40,764 $113,963 n/a
TT0322 # 03 Y:2025 03 2025 INSTALL OCCUPANCY SENSORS $583 $875 n/a
TT0322 # 02 Y:2025 02 2025 OPTIMIZE PLANT POWER FACTOR $16,071 $15,000 n/a
TT0322 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $415 $1,570 n/a
GT0989 # 07 Y:2025 07 2025 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $23,815 $115,000 n/a
GT0989 # 03 Y:2025 03 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $42,149 $150,000 n/a
GT0989 # 02 Y:2025 02 2025 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $200 $100 n/a
GT0989 # 01 Y:2025 01 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,407 $2,600 n/a
GT0989 # 09 Y:2025 09 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $29,893 $435,677 n/a
GT0989 # 08 Y:2025 08 2025 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $20,031 $100,000 n/a
GT0989 # 04 Y:2025 04 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $430 $1,777 n/a
GT0989 # 06 Y:2025 06 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,216 $5,400 n/a
GT0989 # 05 Y:2025 05 2025 INSULATE BARE EQUIPMENT $442 $1,852 n/a
AM0938 # 05 Y:2025 05 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,804 $29,010 n/a
AM0938 # 03 Y:2025 03 2025 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,260 $15,000 n/a
AM0938 # 02 Y:2025 02 2025 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $23,487 $32,590 n/a
AM0938 # 01 Y:2025 01 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $213,909 $2,311,826 n/a
AM0938 # 06 Y:2025 06 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,360 $10,180 n/a
AM0938 # 04 Y:2025 04 2025 OPTIMIZE PLANT POWER FACTOR $6,940 $16,200 n/a