IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

999

matching recommendations
Reset
NAICS 3312 Steel Product Manufacturing from Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0931 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,661 $28,728 Not Implemented
OK0931 # 04 Y:2016 04 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,634 $8,294 Not Implemented
OK0931 # 05 Y:2016 05 2016 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,235 $590 Implemented
OK0931 # 06 Y:2016 06 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,555 $1,498 Implemented
OK0931 # 07 Y:2016 07 2016 USE RADIANT HEATER FOR SPOT HEATING $2,973 $11,940 Not Implemented
OK0931 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,151 $1,256 Not Implemented
OK0931 # 09 Y:2016 09 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $143 $182 Not Implemented
LE0406 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,200 $0 Implemented
LE0406 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $896 $250 Not Implemented
LE0406 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,001 $300 Implemented
LE0406 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,582 $1,000 Implemented
LE0406 # 05 Y:2015 05 2015 OPTIMIZE PLANT POWER FACTOR $4,279 $2,920 Not Implemented
LE0406 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $6,858 $8,310 Implemented
LE0406 # 07 Y:2015 07 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,691 $65,000 Implemented
WM0064 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $687 $1,950 Not Implemented
WM0064 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,641 $8,621 Implemented
WM0064 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,350 $0 Not Implemented
WM0064 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,497 $1,640 Implemented
WM0064 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,738 $8,210 Not Implemented
WM0064 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,868 $3,500 Not Implemented
WM0064 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $11,151 $1,631 Not Implemented
WM0064 # 08 Y:2015 08 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,928 $34,000 Not Implemented
LE0390 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,174 $28 Not Implemented
LE0390 # 02 Y:2015 02 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,972 $5,400 Not Implemented
LE0390 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,489 $1,000 Not Implemented