Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsNAICS | 3312 | Steel Product Manufacturing from Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0502 # 01 Y:2017 | 01 | 2017 | ADJUST BURNERS FOR EFFICIENT OPERATION | $292,994 | $0 | Not Implemented |
MI0296 # 12 Y:2016 | 12 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $544 | $2,357 | Not Implemented |
MI0296 # 10 Y:2016 | 10 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $926 | $40 | Implemented |
MI0296 # 11 Y:2016 | 11 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $746 | $440 | Implemented |
MI0296 # 01 Y:2016 | 01 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $23,090 | $560 | Not Implemented |
MI0296 # 02 Y:2016 | 02 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $17,090 | $208 | Implemented |
MI0296 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,550 | $40 | Implemented |
MI0296 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,501 | $21,680 | Not Implemented |
MI0296 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,548 | $1,660 | Implemented |
MI0296 # 06 Y:2016 | 06 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,937 | $4,464 | Implemented |
MI0296 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,576 | $2,520 | Implemented |
MI0296 # 08 Y:2016 | 08 | 2016 | USE PHOTOCELL CONTROLS | $1,616 | $2,240 | Not Implemented |
MI0296 # 09 Y:2016 | 09 | 2016 | MINIMIZE WATER USAGE | $970 | $2,200 | Implemented |
UF0417 # 06 Y:2008 | 06 | 2008 | INSTALL COMMON HEADER ON COMPRESSORS | $12,647 | $900 | Not Implemented |
UF0417 # 05 Y:2008 | 05 | 2008 | INSTALL COMMON HEADER ON COMPRESSORS | $14,617 | $0 | Not Implemented |
UF0417 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,992 | $0 | Implemented |
UF0417 # 03 Y:2008 | 03 | 2008 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,710 | $0 | Implemented |
UF0417 # 02 Y:2008 | 02 | 2008 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,012 | $0 | Implemented |
UF0417 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,847 | $36,441 | Not Implemented |
UF0417 # 07 Y:2008 | 07 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,601 | $64,339 | Not Implemented |
UF0417 # 08 Y:2008 | 08 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,201 | $1,200 | Not Implemented |
UF0417 # 09 Y:2008 | 09 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $65,568 | $31,410 | Not Implemented |
UF0417 # 10 Y:2008 | 10 | 2008 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $45,096 | $15,000 | Not Implemented |
UF0417 # 11 Y:2008 | 11 | 2008 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,200 | $4,158 | Not Implemented |
UF0342 # 04 Y:2004 | 04 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,850 | $32,428 | Not Implemented |