IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

999

matching recommendations
Reset
NAICS 3312 Steel Product Manufacturing from Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0154 # 04 Y:2009 04 2009 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $173 $474 Not Implemented
IC0154 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $180 $896 Not Implemented
IC0154 # 06 Y:2009 06 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $178 $240 Not Implemented
IC0154 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $220 $460 Not Implemented
IC0154 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $87 $0 Not Implemented
IC0154 # 09 Y:2009 09 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $725 $1,126 Not Implemented
IC0154 # 10 Y:2009 10 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,269 $0 Not Implemented
IC0154 # 11 Y:2009 11 2009 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,094 $0 Not Implemented
MS0337 # 01 Y:2009 01 2009 COVER OPEN TANKS $284,008 $8,869 Implemented
MS0337 # 02 Y:2009 02 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $43,299 $6,450 Not Implemented
MS0337 # 03 Y:2009 03 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $38,691 $2,000 Not Implemented
MS0337 # 04 Y:2009 04 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,045 $5,142 Not Implemented
MS0337 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,874 $4,735 Not Implemented
LE0283 # 01 Y:2009 01 2009 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $48,061 $100,000 Not Implemented
LE0283 # 02 Y:2009 02 2009 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $46,426 $38,000 Implemented
LE0283 # 03 Y:2009 03 2009 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $38,523 $560 Implemented
LE0283 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,658 $1,672 Implemented
LE0283 # 05 Y:2009 05 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $28,610 $12,000 Not Implemented
LE0283 # 06 Y:2009 06 2009 REPAIR OR REPLACE STEAM TRAPS $27,445 $10,500 Not Implemented
LE0283 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,225 $30,000 Not Implemented
LE0283 # 08 Y:2009 08 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $21,508 $30,000 Not Implemented
LE0283 # 09 Y:2009 09 2009 USE RADIANT HEATER FOR SPOT HEATING $19,446 $5,000 Not Implemented
LE0283 # 10 Y:2009 10 2009 REPLACE BOILER $19,000 $30,000 Not Implemented
LE0283 # 11 Y:2009 11 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $18,031 $30,000 Implemented
LE0283 # 12 Y:2009 12 2009 COVER OPEN TANKS $9,339 $10,000 Implemented