Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
999
matching recommendationsNAICS | 3312 | Steel Product Manufacturing from Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0207 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $851 | $500 | Implemented |
UD0711 # 01 Y:2005 | 01 | 2005 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $343,339 | $10,000 | Not Implemented |
UD0711 # 02 Y:2005 | 02 | 2005 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $143,601 | $246,784 | Not Implemented |
UD0711 # 03 Y:2005 | 03 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $113,328 | $400,000 | Not Implemented |
UD0711 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,341 | $80,215 | Not Implemented |
UD0711 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,813 | $2,025 | Implemented |
UD0711 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,651 | $1,240 | Implemented |
UD0711 # 07 Y:2005 | 07 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $4,427 | $600 | Not Implemented |
UD0711 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $1,305 | $3,530 | Implemented |
WI0476 # 01 Y:2004 | 01 | 2004 | BURN WASTE OIL FOR HEAT | $73,937 | $36,000 | Not Implemented |
WI0476 # 02 Y:2004 | 02 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $15,807 | $21,000 | Not Implemented |
WI0476 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,856 | $8,856 | Not Implemented |
WI0476 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $5,082 | $2,944 | Not Implemented |
WI0476 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,557 | $4,280 | Implemented |
WI0476 # 06 Y:2004 | 06 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,148 | $0 | Implemented |
WI0476 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,141 | $640 | Implemented |
WI0476 # 08 Y:2004 | 08 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $308 | $776 | Not Implemented |
UD0702 # 01 Y:2004 | 01 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $111,296 | $120,000 | Not Implemented |
UD0702 # 02 Y:2004 | 02 | 2004 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $33,150 | $13,800 | Not Implemented |
UD0702 # 03 Y:2004 | 03 | 2004 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $25,611 | $10,795 | Implemented |
UD0702 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,166 | $106,664 | Not Implemented |
UD0702 # 05 Y:2004 | 05 | 2004 | MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS | $11,155 | $11,025 | Not Implemented |
UD0702 # 06 Y:2004 | 06 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,969 | $3,010 | Not Implemented |
UD0702 # 07 Y:2004 | 07 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $3,625 | $0 | Implemented |
UD0702 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,961 | $92 | Implemented |