IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
NAICS 3312 Steel Product Manufacturing from Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0296 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,196 $12,921 n/a
IC0296 # 05 Y:2024 05 2024 UPGRADE CONTROLS ON COMPRESSORS $7,015 $9,479 n/a
IC0296 # 06 Y:2024 06 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,898 $23,884 n/a
IC0296 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,777 $8,406 n/a
IC0296 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,324 $400 n/a
IC0296 # 08 Y:2024 08 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $271,456 $1,202,972 n/a
IC0296 # 07 Y:2024 07 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $465,211 $3,649,800 n/a
IC0296 # 12 Y:2024 12 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,022 $1,150 n/a
IC0296 # 01 Y:2024 01 2024 INSULATE BARE EQUIPMENT $5,921 $1,066 n/a
IC0296 # 09 Y:2024 09 2024 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $62,421 $0 n/a
IC0296 # 10 Y:2024 10 2024 REPLACE BOILER $112,681 $127,793 n/a
IC0296 # 11 Y:2024 11 2024 INSULATE BARE EQUIPMENT $2,446 $608 n/a
IC0296 # 13 Y:2024 13 2024 REPAIR OR REPLACE STEAM TRAPS $7,154 $1,011 n/a
IC0228 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,760 $4,700 Not Implemented
IC0228 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $759 $167 Not Implemented
IC0228 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,679 $14,948 Implemented
IC0228 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $9,605 $2,359 Implemented
IC0228 # 04 Y:2019 04 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,006 $4,868 Not Implemented
IC0214 # 02 Y:2019 02 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $54,479 $37,103 Not Implemented
IC0214 # 06 Y:2019 06 2019 BURN WOOD BY-PRODUCTS FOR HEAT $4,994 $7,572 Not Implemented
IC0214 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,132 $4,600 Implemented
IC0214 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,255 $68,455 Implemented
IC0214 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,278 $18,800 Implemented
IC0214 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $23,818 $40,641 Implemented
IP0086 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,932 $4 Not Implemented