Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 331210 | Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0763 # 02 Y:2018 | 02 | 2018 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $515,700 | $2,200,000 | Not Implemented |
AM0763 # 03 Y:2018 | 03 | 2018 | OPTIMIZE PLANT POWER FACTOR | $105,400 | $136,400 | Implemented |
AM0763 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $98,130 | $20,000 | Implemented |
AM0763 # 05 Y:2018 | 05 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $45,525 | $8,000 | Not Implemented |
AM0763 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,730 | $42,230 | Implemented |
AM0763 # 07 Y:2018 | 07 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $38,500 | $400 | Not Implemented |
AM0763 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,600 | $37,900 | Implemented |
AM0763 # 09 Y:2018 | 09 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,640 | $7,720 | Implemented |
AM0763 # 01 Y:2018 | 01 | 2018 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $327,000 | $0 | Not Implemented |
SU0466 # 02 Y:2018 | 02 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,326 | $2,058 | Implemented |
SU0466 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,439 | $44,602 | Implemented |
SU0466 # 05 Y:2018 | 05 | 2018 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $111 | $217 | Not Implemented |
SU0466 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $586 | $876 | Implemented |
SU0466 # 03 Y:2018 | 03 | 2018 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $166,039 | $203,490 | Not Implemented |
SU0466 # 01 Y:2018 | 01 | 2018 | ELIMINATE/REDUCE AN OPERATION | $9,225 | $1,173 | Not Implemented |
UD0990 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,680 | $4,200 | Not Implemented |
UD0990 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $574 | $1,000 | Not Implemented |
UD0990 # 03 Y:2018 | 03 | 2018 | OPTIMIZE PLANT POWER FACTOR | $72,351 | $48,000 | Not Implemented |
UD0990 # 04 Y:2018 | 04 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,458 | $400 | Not Implemented |
UD0990 # 05 Y:2018 | 05 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $2,774 | $10,470 | Not Implemented |
UD0990 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,379 | $200,263 | Not Implemented |