Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsNAICS | 331210 | Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0937 # 05 Y:2019 | 05 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $17,740 | $158,500 | Not Implemented |
GT0937 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $32,772 | $100,000 | Not Implemented |
GT0937 # 03 Y:2019 | 03 | 2019 | OPTIMIZE PLANT POWER FACTOR | $10,618 | $38,920 | Not Implemented |
GT0937 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,545 | $4,311 | Implemented |
GT0937 # 01 Y:2019 | 01 | 2019 | INSTALL OCCUPANCY SENSORS | $1,362 | $310 | Implemented |
AM0789 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $15,300 | $53,500 | Implemented |
AM0789 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,740 | $46,480 | Implemented |
AM0789 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,900 | $1,620 | Implemented |
AM0789 # 05 Y:2019 | 05 | 2019 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,600 | $0 | Implemented |
AM0789 # 04 Y:2019 | 04 | 2019 | INSTALL SKYLIGHTS | $4,290 | $7,120 | Not Implemented |
AM0789 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,100 | $2,000 | Implemented |
OK1013 # 06 Y:2019 | 06 | 2019 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $4,999 | $4,520 | Implemented |
OK1013 # 05 Y:2019 | 05 | 2019 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $264,923 | $206,847 | Not Implemented |
OK1013 # 04 Y:2019 | 04 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,610 | $6,480 | Not Implemented |
OK1013 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $60,608 | $35,153 | Implemented |
OK1013 # 02 Y:2019 | 02 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,945 | $0 | Not Implemented |
OK1013 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,284 | $4,982 | Implemented |
MZ0269 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,409 | $250 | Implemented |
MZ0269 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,423 | $6,600 | Implemented |
MZ0269 # 03 Y:2019 | 03 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $17,310 | $10,400 | Not Implemented |
IC0214 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,132 | $4,600 | Implemented |
IC0214 # 06 Y:2019 | 06 | 2019 | BURN WOOD BY-PRODUCTS FOR HEAT | $4,994 | $7,572 | Not Implemented |
IC0214 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,255 | $68,455 | Implemented |
IC0214 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,278 | $18,800 | Implemented |
IC0214 # 02 Y:2019 | 02 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $54,479 | $37,103 | Not Implemented |