Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
668
matching recommendationsNAICS | 33122 | Rolling and Drawing of Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0194 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,915 | $2,000 | Not Implemented |
LE0194 # 05 Y:2004 | 05 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,360 | $2,500 | Not Implemented |
LE0194 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,196 | $4,000 | Implemented |
LE0194 # 07 Y:2004 | 07 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,787 | $750 | Implemented |
UD0700 # 14 Y:2004 | 14 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $706 | $243 | Not Implemented |
UD0700 # 06 Y:2004 | 06 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,941 | $0 | Not Implemented |
UD0700 # 13 Y:2004 | 13 | 2004 | REDUCE FLUID FLOW RATES | $774 | $850 | Not Implemented |
UD0700 # 12 Y:2004 | 12 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $850 | $328 | Not Implemented |
UD0700 # 11 Y:2004 | 11 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,104 | $700 | Not Implemented |
UD0700 # 10 Y:2004 | 10 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,258 | $1,405 | Not Implemented |
UD0700 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,471 | $4,116 | Not Implemented |
UD0700 # 08 Y:2004 | 08 | 2004 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,312 | $8,302 | Not Implemented |
UD0700 # 07 Y:2004 | 07 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,656 | $3,000 | Not Implemented |
UD0700 # 15 Y:2004 | 15 | 2004 | INSULATE BARE EQUIPMENT | $604 | $1,575 | Not Implemented |
UD0700 # 16 Y:2004 | 16 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $588 | $500 | Implemented |
UD0700 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,176 | $1,380 | Not Implemented |
UD0700 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,353 | $82,536 | Implemented |
UD0700 # 03 Y:2004 | 03 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $35,000 | $0 | Not Implemented |
UD0700 # 02 Y:2004 | 02 | 2004 | INSTALL EQUIPMENT TO MOVE PRODUCT | $256,000 | $538,944 | Not Implemented |
UD0700 # 01 Y:2004 | 01 | 2004 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $454,279 | $226,320 | Not Implemented |
UD0699 # 01 Y:2004 | 01 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $96,000 | $204,300 | Not Implemented |
UD0699 # 08 Y:2004 | 08 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $975 | $255 | Implemented |
UD0699 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,162 | $8,406 | Implemented |
UD0699 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,689 | $0 | Implemented |
UD0699 # 05 Y:2004 | 05 | 2004 | DISCONNECT BALLASTS | $7,031 | $377 | Implemented |