IAC logo
IAC Assessment: UD0702
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0702
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2004
Principal Product Fabricated Sheet Metal Parts, Telescoping Masts
NAICS 331222 - Steel Wire Drawing
SIC 3343 -
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 279,000
Annual Production 5,000,000 Pounds
Production Hrs. Annual 6,864
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $292,471 5,056,538 kWh $0.06
Natural Gas $206,150 24,999 MMBtu $8.25
TOTAL ENERGY COSTS $550,370
RECOMMENDED SAVINGS* $221,040 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,089
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$111,296
Cost:
$120,000
- - $(-7,368) (-2,040) $53,924 6,334 - - $6,240 - $58,500 - -
-
kWh
$(-7,368)
(-2,040)
kW-months/year
$53,924
6,334
MMBtu
-
-
Tgal
$6,240
-
$
$58,500
-
$
02: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$33,150
Cost:
$13,800
- - - - $33,150 3,900 - - - - - - -
-
kWh
-
-
kW-months/year
$33,150
3,900
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$25,611
Cost:
$10,795
- - - - - - - - $25,611 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$25,611
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,166
Cost:
$106,664
$21,062 583,440 $4,104 1,020 - - - - - - - - $21,062
583,440
kWh
$4,104
1,020
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 3.7222 MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS Savings:
$11,155
Cost:
$11,025
- - - - - - $11,155 1,559,789 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,155
1,559,789
Tgal
-
-
$
-
-
$
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$5,969
Cost:
$3,010
$3,942 109,200 $2,027 506 - - - - - - - - $3,942
109,200
kWh
$2,027
506
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,625
Cost:
-
$2,361 65,395 $1,264 314 - - - - - - - - $2,361
65,395
kWh
$1,264
314
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,961
Cost:
$92
$2,478 68,640 $483 120 - - - - - - - - $2,478
68,640
kWh
$483
120
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,215
Cost:
$600
$791 21,915 $424 105 - - - - - - - - $791
21,915
kWh
$424
105
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$892
Cost:
$114
$757 20,966 $135 34 - - - - - - - - $757
20,966
kWh
$135
34
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$221,040
Cost:
$266,100
$31,391 869,556 $1,069 59 $87,074 10,234 $11,155 1,559,789 $31,851 - $58,500 - $31,391
869,556
kWh
$1,069
59
kW-months/year
$87,074
10,234
MMBtu
$11,155
1,559,789
Tgal
$31,851
-
$
$58,500
-
$
TOTAL IMPLEMENTED Savings:
$33,089
Cost:
$11,001
$5,596 155,001 $1,882 468 - - - - $25,611 - - - $5,596
155,001
kWh
$1,882
468
kW-months/year
-
-
MMBtu
-
-
Tgal
$25,611
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material