Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
242
matching recommendationsNAICS | 33122 | Rolling and Drawing of Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0321 # 09 Y:2005 | 09 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $875 | $312 | Implemented |
WV0321 # 10 Y:2005 | 10 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $532 | $140 | Not Implemented |
WV0321 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,340 | $210 | Not Implemented |
WV0321 # 08 Y:2005 | 08 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,323 | $1,782 | Not Implemented |
WV0321 # 01 Y:2005 | 01 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,415 | $1,613 | Implemented |
WV0321 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,363 | $25 | Implemented |
WV0321 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,125 | $454 | Implemented |
WV0321 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,363 | $2,650 | Implemented |
WV0321 # 02 Y:2005 | 02 | 2005 | UPGRADE CONVEYORS | $2,844 | $4,000 | Not Implemented |
WV0321 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,508 | $9,090 | Implemented |
UD0722 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,334 | $192 | Implemented |
UD0722 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $104 | $102 | Implemented |
UD0722 # 06 Y:2005 | 06 | 2005 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,730 | $0 | Not Implemented |
UD0722 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,734 | $9,650 | Implemented |
UD0722 # 04 Y:2005 | 04 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $2,776 | $1,448 | Implemented |
UD0722 # 02 Y:2005 | 02 | 2005 | INSTALL OCCUPANCY SENSORS | $6,570 | $21,200 | Not Implemented |
UD0722 # 01 Y:2005 | 01 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $113,700 | $454,800 | Not Implemented |
WV0308 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $1,350 | $72 | Implemented |
WV0308 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,329 | $0 | Implemented |
WV0308 # 11 Y:2005 | 11 | 2005 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $99,840 | $150,768 | Not Implemented |
WV0308 # 06 Y:2005 | 06 | 2005 | USE SYNTHETIC LUBRICANT | $2,037 | $124 | Implemented |
WV0308 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,560 | $110 | Implemented |
WV0308 # 03 Y:2005 | 03 | 2005 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,526 | $714 | Implemented |
WV0308 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,364 | $3,520 | Implemented |
WV0308 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,098 | $382 | Not Implemented |