IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

333

matching recommendations
Reset
NAICS 331221 Rolled Steel Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0321 # 10 Y:2005 10 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $532 $140 Not Implemented
WV0321 # 09 Y:2005 09 2005 DEVELOP A REPAIR/REPLACE POLICY $875 $312 Implemented
WV0321 # 08 Y:2005 08 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,323 $1,782 Not Implemented
WV0321 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,340 $210 Not Implemented
WV0321 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,363 $2,650 Implemented
WV0321 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,363 $25 Implemented
WV0321 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,508 $9,090 Implemented
WV0321 # 02 Y:2005 02 2005 UPGRADE CONVEYORS $2,844 $4,000 Not Implemented
WV0321 # 01 Y:2005 01 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,415 $1,613 Implemented
UD0722 # 01 Y:2005 01 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $113,700 $454,800 Not Implemented
UD0722 # 02 Y:2005 02 2005 INSTALL OCCUPANCY SENSORS $6,570 $21,200 Not Implemented
UD0722 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,334 $192 Implemented
UD0722 # 04 Y:2005 04 2005 UPGRADE CONTROLS ON COMPRESSORS $2,776 $1,448 Implemented
UD0722 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,734 $9,650 Implemented
UD0722 # 06 Y:2005 06 2005 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,730 $0 Not Implemented
UD0722 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $104 $102 Implemented
UD0711 # 01 Y:2005 01 2005 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $343,339 $10,000 Not Implemented
UD0711 # 02 Y:2005 02 2005 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $143,601 $246,784 Not Implemented
UD0711 # 03 Y:2005 03 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $113,328 $400,000 Not Implemented
UD0711 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,341 $80,215 Not Implemented
UD0711 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,813 $2,025 Implemented
UD0711 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,651 $1,240 Implemented
UD0711 # 07 Y:2005 07 2005 UPGRADE CONTROLS ON COMPRESSORS $4,427 $600 Not Implemented
UD0711 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $1,305 $3,530 Implemented
UD0691 # 01 Y:2004 01 2004 MINIMIZE WATER USAGE $20,840 $1,380 Not Implemented