Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
333
matching recommendationsNAICS | 331221 | Rolled Steel Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0962 # 02 Y:2017 | 02 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,791 | $211,700 | Implemented |
UD0962 # 01 Y:2017 | 01 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $452 | $300 | Not Implemented |
UD0962 # 09 Y:2017 | 09 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,808 | $5,292 | Not Implemented |
UD0962 # 08 Y:2017 | 08 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,049 | $17,049 | Not Implemented |
UD0962 # 10 Y:2017 | 10 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,104 | $1,000 | Implemented |
UD0946 # 08 Y:2016 | 08 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $214 | $0 | Not Implemented |
UD0946 # 07 Y:2016 | 07 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $462 | $2,400 | Implemented |
UD0946 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,478 | $77,725 | Not Implemented |
UD0946 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $304 | $0 | Implemented |
UD0946 # 04 Y:2016 | 04 | 2016 | OPTIMIZE PLANT POWER FACTOR | $3,057 | $2,000 | Not Implemented |
UD0946 # 03 Y:2016 | 03 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $776 | $400 | Not Implemented |
UD0946 # 02 Y:2016 | 02 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,148 | $1,660 | Not Implemented |
UD0946 # 01 Y:2016 | 01 | 2016 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $5,504 | $500 | Implemented |
OR0668 # 08 Y:2016 | 08 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $40,925 | $70,000 | Not Implemented |
OR0668 # 07 Y:2016 | 07 | 2016 | IMPROVE COMBUSTION CONTROL CAPABILITY | $131,042 | $638,642 | Not Implemented |
OR0668 # 06 Y:2016 | 06 | 2016 | IMPROVE COMBUSTION CONTROL CAPABILITY | $20,233 | $54,456 | Not Implemented |
OR0668 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,529 | $42,750 | Not Implemented |
OR0668 # 04 Y:2016 | 04 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $20,693 | $21,375 | Not Implemented |
OR0668 # 03 Y:2016 | 03 | 2016 | REDUCE FLUID FLOW RATES | $9,090 | $13,345 | Implemented |
OR0668 # 02 Y:2016 | 02 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,966 | $1,900 | Implemented |
OR0668 # 01 Y:2016 | 01 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $64,602 | $27,375 | Not Implemented |
OK0931 # 04 Y:2016 | 04 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,634 | $8,294 | Not Implemented |
OK0931 # 08 Y:2016 | 08 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,151 | $1,256 | Not Implemented |
OK0931 # 07 Y:2016 | 07 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $2,973 | $11,940 | Not Implemented |
OK0931 # 06 Y:2016 | 06 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,555 | $1,498 | Implemented |