IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 331221 Rolled Steel Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0065 # 02 Y:2003 02 2003 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $243,209 $1,400,000 Implemented
IC0065 # 03 Y:2003 03 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,757 $516 Implemented
IC0065 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,168 $68,925 Not Implemented
IC0065 # 05 Y:2003 05 2003 AUTOMATE FINISHING PROCESS $189,440 $29,000 Not Implemented
IC0065 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,360 $13,999 Implemented
IC0065 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,611 $3,488 Not Implemented
IC0065 # 01 Y:2003 01 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $38,692 $7,174 Not Implemented
LE0165 # 06 Y:2003 06 2003 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $3,608 $500 Not Implemented
LE0165 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $498 $0 Not Implemented
LE0165 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $468 $0 Implemented
LE0165 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,356 $263 Not Implemented
LE0165 # 02 Y:2003 02 2003 INSTALL OCCUPANCY SENSORS $2,288 $500 Not Implemented
LE0165 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $8,970 $1,440 Implemented
LE0154 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $83 $150 Not Implemented
LE0154 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,485 $750 Implemented
LE0154 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $5,016 $2,582 Not Implemented
LE0154 # 04 Y:2003 04 2003 INSULATE FEEDWATER TANK $363 $183 Not Implemented
LE0154 # 03 Y:2003 03 2003 REPAIR OR REPLACE STEAM TRAPS $3,519 $3,000 Implemented
LE0154 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,185 $300 Not Implemented
LE0154 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $0 Implemented