Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 331221 | Rolled Steel Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0321 # 10 Y:2005 | 10 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $532 | $140 | Not Implemented |
WV0321 # 09 Y:2005 | 09 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $875 | $312 | Implemented |
WV0321 # 08 Y:2005 | 08 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,323 | $1,782 | Not Implemented |
WV0321 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,340 | $210 | Not Implemented |
WV0321 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,363 | $2,650 | Implemented |
WV0321 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,363 | $25 | Implemented |
WV0321 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,125 | $454 | Implemented |
WV0321 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,508 | $9,090 | Implemented |
WV0321 # 02 Y:2005 | 02 | 2005 | UPGRADE CONVEYORS | $2,844 | $4,000 | Not Implemented |
WV0321 # 01 Y:2005 | 01 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,415 | $1,613 | Implemented |
UD0722 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,734 | $9,650 | Implemented |
UD0722 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $104 | $102 | Implemented |
UD0722 # 06 Y:2005 | 06 | 2005 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,730 | $0 | Not Implemented |
UD0722 # 04 Y:2005 | 04 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $2,776 | $1,448 | Implemented |
UD0722 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,334 | $192 | Implemented |
UD0722 # 02 Y:2005 | 02 | 2005 | INSTALL OCCUPANCY SENSORS | $6,570 | $21,200 | Not Implemented |
UD0722 # 01 Y:2005 | 01 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $113,700 | $454,800 | Not Implemented |
UD0711 # 01 Y:2005 | 01 | 2005 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $343,339 | $10,000 | Not Implemented |
UD0711 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $1,305 | $3,530 | Implemented |
UD0711 # 07 Y:2005 | 07 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $4,427 | $600 | Not Implemented |
UD0711 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,651 | $1,240 | Implemented |
UD0711 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,813 | $2,025 | Implemented |
UD0711 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,341 | $80,215 | Not Implemented |
UD0711 # 03 Y:2005 | 03 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $113,328 | $400,000 | Not Implemented |
UD0711 # 02 Y:2005 | 02 | 2005 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $143,601 | $246,784 | Not Implemented |