Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
335
matching recommendationsNAICS | 331222 | Steel Wire Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0120 # 10 Y:2006 | 10 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $991 | $7,638 | Not Implemented |
IC0120 # 11 Y:2006 | 11 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $71,667 | $6,720 | Implemented |
WV0308 # 03 Y:2005 | 03 | 2005 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,526 | $714 | Implemented |
WV0308 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,098 | $382 | Not Implemented |
WV0308 # 11 Y:2005 | 11 | 2005 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $99,840 | $150,768 | Not Implemented |
WV0308 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,298 | $0 | Not Implemented |
WV0308 # 06 Y:2005 | 06 | 2005 | USE SYNTHETIC LUBRICANT | $2,037 | $124 | Implemented |
WV0308 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $1,350 | $72 | Implemented |
WV0308 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,329 | $0 | Implemented |
WV0308 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,156 | $4,132 | Implemented |
WV0308 # 10 Y:2005 | 10 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $835 | $180 | Not Implemented |
WV0308 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,364 | $3,520 | Implemented |
WV0308 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,560 | $110 | Implemented |
UD0702 # 01 Y:2004 | 01 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $111,296 | $120,000 | Not Implemented |
UD0702 # 02 Y:2004 | 02 | 2004 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $33,150 | $13,800 | Not Implemented |
UD0702 # 03 Y:2004 | 03 | 2004 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $25,611 | $10,795 | Implemented |
UD0702 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,166 | $106,664 | Not Implemented |
UD0702 # 05 Y:2004 | 05 | 2004 | MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS | $11,155 | $11,025 | Not Implemented |
UD0702 # 06 Y:2004 | 06 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,969 | $3,010 | Not Implemented |
UD0702 # 07 Y:2004 | 07 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $3,625 | $0 | Implemented |
UD0702 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,961 | $92 | Implemented |
UD0702 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,215 | $600 | Not Implemented |
UD0702 # 10 Y:2004 | 10 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $892 | $114 | Implemented |
LE0194 # 01 Y:2004 | 01 | 2004 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $866,040 | $200,000 | Implemented |
LE0194 # 02 Y:2004 | 02 | 2004 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $59,658 | $12,500 | Implemented |