IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 331222 Steel Wire Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0418 # 15 Y:2012 15 2012 MOVE PRODUCT USING MECHANICAL MEANS $12,870 $20,000 Implemented
BD0418 # 14 Y:2012 14 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,121 $1,225 Implemented
BD0418 # 13 Y:2012 13 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,210 $1,500 Implemented
BD0418 # 12 Y:2012 12 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,527 $500 Implemented
BD0418 # 11 Y:2012 11 2012 INSTALL OCCUPANCY SENSORS $2,653 $1,200 Implemented
BD0418 # 10 Y:2012 10 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,117 $20 Implemented
BD0418 # 09 Y:2012 09 2012 INSTALL SKYLIGHTS $5,048 $12,215 Implemented
BD0418 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,441 $600 Implemented
BD0418 # 06 Y:2012 06 2012 USE PHOTOCELL CONTROLS $18,400 $14,100 Implemented
BD0418 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,077 $313,924 Implemented
BD0418 # 01 Y:2012 01 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $147,427 $200,000 Implemented
IC0120 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,452 $8,047 Implemented
IC0120 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $447 $911 Implemented
IC0120 # 11 Y:2006 11 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $71,667 $6,720 Implemented
IC0120 # 09 Y:2006 09 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $114,144 $385,200 Implemented
IC0120 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,533 $18,187 Implemented
IC0120 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,943 $1,300 Implemented
IC0120 # 01 Y:2006 01 2006 RECOVER AND REUSE SPENT ACID BATHS $132,386 $176,160 Implemented
IC0120 # 02 Y:2006 02 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $916 $0 Implemented
BD0253 # 10 Y:2004 10 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,561 $385 Implemented
BD0253 # 15 Y:2004 15 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $754 $500 Implemented
BD0253 # 16 Y:2004 16 2004 $8,820 $144 Implemented
BD0253 # 08 Y:2004 08 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,816 $2,400 Implemented
BD0253 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,360 $1,275 Implemented
BD0253 # 03 Y:2004 03 2004 INSTALL AUTOMATIC STACK DAMPER $2,979 $5,500 Implemented