IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 3313 Alumina and Aluminum Production and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0125 # 02 Y:2007 02 2007 $20,000 $20,000 Not Implemented
LM0125 # 03 Y:2007 03 2007 $89,704 $11,000 Implemented
LM0125 # 04 Y:2007 04 2007 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $62,618 $40,000 Not Implemented
LM0125 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,003 $2,604 Implemented
SD0313 # 08 Y:2003 08 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,800 $5,000 Not Implemented
SD0313 # 07 Y:2003 07 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,882 $15,000 Not Implemented
SD0313 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,860 $160 Implemented
SD0313 # 05 Y:2003 05 2003 $5,962 $1,350 Not Implemented
SD0313 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,406 $0 Not Implemented
SD0313 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,447 $14,000 Not Implemented
SD0313 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,529 $11,275 Not Implemented
SD0313 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $58,217 $20,000 Not Implemented
SD0310 # 09 Y:2003 09 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,770 $0 Implemented
SD0310 # 10 Y:2003 10 2003 USE EVAPORATION TO CONCENTRATE MATERIAL $10,000 $15,000 Not Implemented
SD0310 # 11 Y:2003 11 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,800 $5,000 Not Implemented
SD0310 # 08 Y:2003 08 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,515 $4,000 Not Implemented
SD0310 # 07 Y:2003 07 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,916 $2,000 Not Implemented
SD0310 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,797 $0 Implemented
SD0310 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,878 $280 Implemented
SD0310 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $9,894 $3,000 Not Implemented
SD0310 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,693 $16,000 Not Implemented
SD0310 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,480 $14,000 Not Implemented
SD0310 # 01 Y:2003 01 2003 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $374,073 $1,142,500 Not Implemented