IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
NAICS 3313 Alumina and Aluminum Production and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0506 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $3,073 $3,560 Not Implemented
WV0506 # 03 Y:2015 03 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,907 $0 Not Implemented
WV0506 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,853 $7,076 Implemented
WV0506 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,708 $22,650 Not Implemented
WV0506 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,457 $7,450 Implemented
WV0506 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,757 $5,570 Not Implemented
WV0506 # 10 Y:2015 10 2015 DEVELOP A REPAIR/REPLACE POLICY $790 $1,205 Implemented
WV0506 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,579 $270 Implemented
WV0506 # 08 Y:2015 08 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,372 $351 Not Implemented
WV0506 # 09 Y:2015 09 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,221 $1,000 Implemented
UM0454 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $13,892 $4,500 Not Implemented
UM0454 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,354 $1,000 Not Implemented
UM0454 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,291 $14,700 Not Implemented
UM0454 # 03 Y:2015 03 2015 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $2,130 $1,710 Implemented
UM0454 # 01 Y:2015 01 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,028 $2,000 Not Implemented
UD0774 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $118,235 $50,000 Not Implemented
UD0774 # 11 Y:2008 11 2008 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,078 $0 Implemented
UD0774 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,863 $6,540 Not Implemented
UD0774 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,237 $0 Not Implemented
UD0774 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,208 $12,758 Not Implemented
UD0774 # 06 Y:2008 06 2008 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $9,454 $0 Implemented
UD0774 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,705 $3,275 Implemented
UD0774 # 04 Y:2008 04 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $15,764 $4,008 Not Implemented
UD0774 # 03 Y:2008 03 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $83,440 $5,000 Implemented
UD0774 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $94,656 $6,000 Implemented