Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
791
matching recommendationsNAICS | 33131 | Alumina and Aluminum Production and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0082 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $295,385 | $90,783 | Implemented |
IC0082 # 04 Y:2004 | 04 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $54,932 | $8,421 | Implemented |
IC0082 # 05 Y:2004 | 05 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,283 | $1,450 | Implemented |
IC0082 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $24,495 | $470,000 | Not Implemented |
IC0082 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $311 | $282,150 | Implemented |
IC0082 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $516 | $600,000 | Not Implemented |
AS0383 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $842 | $200 | Not Implemented |
AS0383 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,498 | $120 | Not Implemented |
AS0383 # 03 Y:2004 | 03 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $16,320 | $40,000 | Not Implemented |
AS0383 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $2,878 | $1,350 | Not Implemented |
AS0383 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,064 | $12,003 | Not Implemented |
AS0383 # 06 Y:2004 | 06 | 2004 | COVER OPEN TANKS | $4,988 | $6,000 | Not Implemented |
AS0383 # 07 Y:2004 | 07 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $244 | $600 | Not Implemented |
AS0383 # 08 Y:2004 | 08 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,942 | $600 | Not Implemented |
AS0383 # 09 Y:2004 | 09 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $406 | $367 | Not Implemented |
AS0383 # 10 Y:2004 | 10 | 2004 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $577,735 | $9,735 | Not Implemented |
MS0248 # 01 Y:2004 | 01 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,530 | $120 | n/a |
MS0248 # 02 Y:2004 | 02 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $4,615 | $2,282 | n/a |
MS0248 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,390 | $9,688 | n/a |
MS0248 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,247 | $4,074 | n/a |
MS0248 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,960 | $8,090 | n/a |
MS0248 # 06 Y:2004 | 06 | 2004 | BURN WASTE OIL FOR HEAT | $2,232 | $2,190 | n/a |
MS0248 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,777 | $228 | n/a |
MS0248 # 08 Y:2004 | 08 | 2004 | APPLY FOR INVESTMENT INCENTIVES | $740 | $25 | n/a |
MS0248 # 09 Y:2004 | 09 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $560 | $1,033 | n/a |