IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

783

matching recommendations
Reset
NAICS 33131 Alumina and Aluminum Production and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0196 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $510 $640 Implemented
TT0242 # 06 Y:2020 06 2020 INSTALL TIMERS AND/OR THERMOSTATS $1,854 $1,700 Not Implemented
TT0242 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,251 $263 Not Implemented
TT0242 # 04 Y:2020 04 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $13,945 $1,900 Not Implemented
TT0242 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,394 $110,050 Not Implemented
TT0242 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,412 $62,026 Not Implemented
TT0242 # 01 Y:2020 01 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,906,442 $4,500,000 Implemented
TR0023 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,791 $1,500 Implemented
TR0023 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,401 $9,785 Implemented
TR0023 # 03 Y:2020 03 2020 METER WASTE WATER $7,020 $1,511 Implemented
GT0936 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $17,484 $2,000 Implemented
GT0936 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $24,628 $2,456 Implemented
GT0936 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,073 $3,500 Implemented
GT0936 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,634 $19,362 Implemented
GT0936 # 05 Y:2019 05 2019 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,489 $1,020 Not Implemented
GT0936 # 06 Y:2019 06 2019 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $19,169 $14,400 Not Implemented
GT0936 # 07 Y:2019 07 2019 BURN A LESS EXPENSIVE GRADE OF FUEL $9,120 $9,016 Implemented
GT0936 # 08 Y:2019 08 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $96,885 $235,465 Not Implemented
LS1912 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $1,198 Not Implemented
LS1912 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,657 $2,850 Not Implemented
LS1912 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,700 $46,200 Not Implemented
LS1912 # 04 Y:2019 04 2019 INSTALL AUTOMATIC PACKING EQUIPMENT $1,164,856 $900,000 Not Implemented
LS1912 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,179 $630 Not Implemented
LS1912 # 02 Y:2019 02 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,767 $150 Not Implemented
LS1912 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,696 $50 Not Implemented