IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

460

matching recommendations
Reset
NAICS 331318 Other Aluminum Rolling, Drawing, and Extruding
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0042 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $15,620 $8,000 Not Implemented
UU0042 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,027 $1,500 Not Implemented
UU0042 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $632 $550 Not Implemented
UU0042 # 04 Y:2003 04 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,960 $0 Not Implemented
UU0042 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,836 $20,051 Not Implemented
UU0042 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $420 $406 Not Implemented
UU0042 # 07 Y:2003 07 2003 RECOVER WASTE HEAT FROM EQUIPMENT $792 $2,296 Not Implemented
UU0042 # 08 Y:2003 08 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,607 $100,240 Not Implemented
UM0227 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $9,930 $1,000 Not Implemented
UM0227 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,000 $1,725 Implemented
UM0227 # 03 Y:2003 03 2003 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $5,893 $10,000 Not Implemented
UM0227 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $7,016 $1,920 Not Implemented
UM0227 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,702 $19,995 Not Implemented
UM0227 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,800 $1,000 Not Implemented
UM0227 # 07 Y:2003 07 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,640 $1,300 Implemented
UM0227 # 08 Y:2003 08 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $303 $700 Not Implemented
SD0313 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $58,217 $20,000 Not Implemented
SD0313 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,529 $11,275 Not Implemented
SD0313 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,447 $14,000 Not Implemented
SD0313 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,406 $0 Not Implemented
SD0313 # 05 Y:2003 05 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,962 $1,350 Not Implemented
SD0313 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,860 $160 Implemented
SD0313 # 07 Y:2003 07 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,882 $15,000 Not Implemented
SD0313 # 08 Y:2003 08 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,800 $5,000 Not Implemented
SD0310 # 01 Y:2003 01 2003 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $374,073 $1,142,500 Not Implemented