Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsNAICS | 3314 | Nonferrous Metal (except Aluminum) Production and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0827 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,909 | $26,950 | Implemented |
MA0827 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,022 | $11,050 | Not Implemented |
MA0827 # 04 Y:2021 | 04 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,685 | $2,000 | Implemented |
MA0827 # 05 Y:2021 | 05 | 2021 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,962 | $10,800 | Not Implemented |
MA0827 # 06 Y:2021 | 06 | 2021 | MINIMIZE WATER USAGE | $1,374 | $3,230 | Not Implemented |
MA0827 # 07 Y:2021 | 07 | 2021 | INSULATE BARE EQUIPMENT | $801 | $1,550 | Not Implemented |
MA0827 # 01 Y:2021 | 01 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $32,062 | $75,000 | Not Implemented |
MA0630 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $189 | $1,300 | Implemented |
MA0630 # 05 Y:2008 | 05 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $407 | $1,944 | Not Implemented |
MA0630 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $639 | $300 | Implemented |
MA0630 # 03 Y:2008 | 03 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,565 | $2,000 | Implemented |
MA0630 # 02 Y:2008 | 02 | 2008 | USE EXISTING DAM TO GENERATE ELECTRICITY | $22,703 | $72,000 | Not Implemented |
MA0630 # 01 Y:2008 | 01 | 2008 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $29,594 | $49,500 | Not Implemented |
MA0574 # 07 Y:2005 | 07 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $960 | $0 | Implemented |
MA0574 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $2,911 | $5,770 | Implemented |
MA0574 # 05 Y:2005 | 05 | 2005 | INSULATE BARE EQUIPMENT | $3,466 | $1,801 | Implemented |
MA0574 # 04 Y:2005 | 04 | 2005 | OPTIMIZE PLANT POWER FACTOR | $20,725 | $20,215 | Not Implemented |
MA0574 # 03 Y:2005 | 03 | 2005 | BURN A LESS EXPENSIVE GRADE OF FUEL | $349,295 | $54,400 | Not Implemented |
MA0574 # 02 Y:2005 | 02 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $140,952 | $230,000 | Implemented |
MA0574 # 01 Y:2005 | 01 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $179,823 | $140,865 | Implemented |