Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
350
matching recommendationsNAICS | 3314 | Nonferrous Metal (except Aluminum) Production and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0435 # 03 Y:2013 | 03 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $966 | $2,500 | Implemented |
UM0435 # 01 Y:2013 | 01 | 2013 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,450 | $4,500 | Implemented |
UM0435 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,500 | $200 | Not Implemented |
UM0435 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,000 | $3,000 | Implemented |
MZ0121 # 13 Y:2013 | 13 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $209 | $400 | Not Implemented |
MZ0121 # 05 Y:2013 | 05 | 2013 | USE SYNTHETIC LUBRICANT | $4,308 | $56 | Implemented |
MZ0121 # 04 Y:2013 | 04 | 2013 | INSTALL SPECTRAL REFLECTORS / DELAMP | $5,476 | $5,441 | Implemented |
MZ0121 # 09 Y:2013 | 09 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,088 | $351 | Implemented |
MZ0121 # 07 Y:2013 | 07 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $4,131 | $480 | Not Implemented |
MZ0121 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,138 | $1,336 | Implemented |
MZ0121 # 03 Y:2013 | 03 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $6,064 | $5,148 | Implemented |
MZ0121 # 01 Y:2013 | 01 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $16,992 | $0 | Not Implemented |
MZ0121 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,019 | $19 | Not Implemented |
MZ0121 # 02 Y:2013 | 02 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,550 | $1,370 | Not Implemented |
MZ0121 # 12 Y:2013 | 12 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $658 | $0 | Implemented |
MZ0121 # 11 Y:2013 | 11 | 2013 | INSTALL OCCUPANCY SENSORS | $1,965 | $3,562 | Not Implemented |
MZ0121 # 10 Y:2013 | 10 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,406 | $740 | Implemented |
LE0356 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,451 | $520 | Not Implemented |
LE0356 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,905 | $5,175 | Implemented |
LE0356 # 08 Y:2013 | 08 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,139 | $1,500 | Not Implemented |
LE0356 # 05 Y:2013 | 05 | 2013 | ADJUST BURNERS FOR EFFICIENT OPERATION | $756 | $0 | Implemented |
LE0356 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,343 | $1,000 | Not Implemented |
LE0356 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,126 | $3,215 | Implemented |
LE0356 # 04 Y:2013 | 04 | 2013 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $146 | $338 | Not Implemented |
LE0356 # 03 Y:2013 | 03 | 2013 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,894 | $51,200 | Not Implemented |