IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146

matching recommendations
Reset
NAICS 33141 Nonferrous Metal (except Aluminum) Smelting and Refining
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0827 # 04 Y:2021 04 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,685 $2,000 Implemented
MA0827 # 06 Y:2021 06 2021 MINIMIZE WATER USAGE $1,374 $3,230 Not Implemented
MA0827 # 07 Y:2021 07 2021 INSULATE BARE EQUIPMENT $801 $1,550 Not Implemented
UU0177 # 10 Y:2021 10 2021 INSTALL OCCUPANCY SENSORS $1,441 $1,625 Not Implemented
UU0177 # 09 Y:2021 09 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,497 $100 Implemented
UU0177 # 08 Y:2021 08 2021 REDUCE VENTILATION AIR $4,129 $4,000 Implemented
UU0177 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,132 $22,614 Not Implemented
UU0177 # 02 Y:2021 02 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $36,240 $6,760 Implemented
UU0177 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,105 $11,650 Implemented
UU0177 # 03 Y:2021 03 2021 USE RADIANT HEATER FOR SPOT HEATING $32,792 $101,000 Not Implemented
UU0177 # 05 Y:2021 05 2021 OPTIMIZE PLANT POWER FACTOR $10,455 $14,250 Implemented
UU0177 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,515 $5,046 Implemented
UU0177 # 01 Y:2021 01 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $57,706 $128,174 Not Implemented
IC0198 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,015 $280 Not Implemented
IC0198 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,843 $50 Not Implemented
IC0198 # 02 Y:2017 02 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,956 $0 Implemented
IC0198 # 01 Y:2017 01 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $73,989 $0 Not Implemented
IC0198 # 05 Y:2017 05 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,160 $4,186 Not Implemented
IC0197 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,402 $12,724 Not Implemented
IC0197 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $8,986 $2,550 Not Implemented
IC0197 # 04 Y:2017 04 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $10,402 $8,241 Implemented
IC0197 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,650 $4,800 Implemented
IC0197 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $56,000 $64,000 Not Implemented
IC0197 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $90,126 $26,155 Implemented
SF0468 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $2,043 $1,679 Implemented