IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146

matching recommendations
Reset
NAICS 33141 Nonferrous Metal (except Aluminum) Smelting and Refining
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0349 # 13 Y:2007 13 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $335 $980 Not Implemented
SF0349 # 14 Y:2007 14 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,454 $11,000 Not Implemented
SF0349 # 15 Y:2007 15 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,751 $37,915 Not Implemented
SF0341 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,716 $0 Implemented
SF0341 # 02 Y:2007 02 2007 REPAIR AND ELIMINATE STEAM LEAKS $2,998 $0 Not Implemented
SF0341 # 03 Y:2007 03 2007 REPAIR AND ELIMINATE STEAM LEAKS $529 $0 Implemented
SF0341 # 04 Y:2007 04 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,392 $919 Implemented
SF0341 # 05 Y:2007 05 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $99,580 $37,915 Not Implemented
SF0341 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,960 $9,373 Implemented
SF0341 # 07 Y:2007 07 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $20,686 $15,000 Implemented
SF0341 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,585 $1,620 Implemented
SF0341 # 09 Y:2007 09 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $51,342 $60,000 Implemented
SF0341 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,113 $1,512 Not Implemented
SF0341 # 11 Y:2007 11 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,983 $19,920 Implemented
SF0341 # 12 Y:2007 12 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $904 $2,887 Not Implemented
SF0341 # 13 Y:2007 13 2007 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $17,456 $0 Implemented
AM0454 # 01 Y:2004 01 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,550 $0 Not Implemented
AM0454 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,440 $200 Not Implemented
AM0454 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $640 $840 Not Implemented
AM0454 # 04 Y:2004 04 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $630 $400 Not Implemented
AM0454 # 05 Y:2004 05 2004 $1,920 $0 Not Implemented