IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

246

matching recommendations
Reset
NAICS 33142 Copper Rolling, Drawing, Extruding, and Alloying
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0721 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $11,745 $160 Implemented
UD0721 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,579 $12,000 Implemented
UD0721 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,580 $0 Implemented
UD0721 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,040 $11,100 Implemented
UD0721 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $2,714 $345 Not Implemented
UD0721 # 08 Y:2005 08 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,229 $860 Not Implemented
UD0721 # 09 Y:2005 09 2005 INSULATE BARE EQUIPMENT $675 $1,820 Not Implemented
UD0721 # 10 Y:2005 10 2005 UPGRADE CONTROLS ON COMPRESSORS $614 $0 Not Implemented
UD0721 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $613 $420 Not Implemented
UD0721 # 12 Y:2005 12 2005 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $560 $1,000 Not Implemented
UD0721 # 13 Y:2005 13 2005 USE RADIANT HEATER FOR SPOT HEATING $506 $1,897 Not Implemented
MA0574 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $179,823 $140,865 Implemented
MA0574 # 02 Y:2005 02 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $140,952 $230,000 Implemented
MA0574 # 03 Y:2005 03 2005 BURN A LESS EXPENSIVE GRADE OF FUEL $349,295 $54,400 Not Implemented
MA0574 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $20,725 $20,215 Not Implemented
MA0574 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $3,466 $1,801 Implemented
MA0574 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $2,911 $5,770 Implemented
MA0574 # 07 Y:2005 07 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $960 $0 Implemented
NC0303 # 01 Y:2004 01 2004 ADOPT IN-HOUSE MATERIAL GENERATION $34,730 $120,000 Not Implemented
NC0303 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,788 $0 Not Implemented
NC0303 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,426 $18,825 Not Implemented
NC0303 # 04 Y:2004 04 2004 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $11,844 $18,280 Not Implemented
NC0303 # 05 Y:2004 05 2004 REDESIGN PROCESS $73,700 $35,000 Not Implemented
NC0303 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,224 $100 Implemented
NC0303 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,085 $1,385 Not Implemented