IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

246

matching recommendations
Reset
NAICS 331420 Copper Rolling, Drawing, Extruding, and Alloying
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2308 # 10 Y:2023 10 2023 ADOPT IN-HOUSE MATERIAL GENERATION $207,659 $464,727 Not Implemented
UC2308 # 09 Y:2023 09 2023 INSTALL TIMERS AND/OR THERMOSTATS $998 $3,691 Implemented
UC2308 # 08 Y:2023 08 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,939 $27,365 Not Implemented
UC2308 # 02 Y:2023 02 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $41,561 $0 Implemented
UC2308 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,353 $987 Implemented
UC2308 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,434 $300 Implemented
UC2308 # 04 Y:2023 04 2023 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $55,687 $171,637 Not Implemented
UC2308 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $204,687 $50,000 Implemented
UC2308 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,525 $1,300 Not Implemented
LE0494 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,586 $11,000 Not Implemented
LE0494 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,225 $8,000 Not Implemented
LE0494 # 06 Y:2020 06 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,199 $10,000 Not Implemented
LE0494 # 05 Y:2020 05 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $22,684 $35,000 Not Implemented
LE0494 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,651 $13,000 Not Implemented
LE0494 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $3,038 $1,620 Implemented
LE0494 # 08 Y:2020 08 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,873 $27,900 Not Implemented
LE0494 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,702 $43,257 Not Implemented
AM0770 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,010 $90 Not Implemented
AM0770 # 08 Y:2019 08 2019 USE SYNTHETIC LUBRICANT $794 $0 Not Implemented
AM0770 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,700 $675 Implemented
AM0770 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $5,940 $9,940 Not Implemented
AM0770 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $8,810 $11,400 Not Implemented
AM0770 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,260 $27,700 Implemented
AM0770 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,150 $2,050 Implemented
AM0770 # 11 Y:2019 11 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $175 $0 Not Implemented