IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

246

matching recommendations
Reset
NAICS 331420 Copper Rolling, Drawing, Extruding, and Alloying
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0358 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $5,543 $24,660 Not Implemented
NC0358 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $308 $100 Implemented
NC0358 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $327 $316 Implemented
NC0358 # 06 Y:2007 06 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $767 $1,000 Not Implemented
NC0358 # 07 Y:2007 07 2007 USE PHOTOCELL CONTROLS $187 $200 Not Implemented
NC0358 # 08 Y:2007 08 2007 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $805,000 $56,000 Not Implemented
MS0294 # 01 Y:2006 01 2006 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $93,222 $290,000 Not Implemented
MS0294 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,448 $70,420 Not Implemented
MS0294 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,175 $21,180 Not Implemented
MS0294 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,047 $10,811 Not Implemented
MS0294 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,760 $172 Implemented
MS0294 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,240 $609 Implemented
MS0294 # 07 Y:2006 07 2006 AIR CONDITION ONLY SPACE NECESSARY $381 $240 Not Implemented
SU0226 # 01 Y:2006 01 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19,304 $0 n/a
SU0226 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,426 $0 n/a
SU0226 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $5,978 $0 n/a
SU0226 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,658 $0 n/a
SU0226 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,300 $770 n/a
SU0226 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,961 $20,200 n/a
SU0226 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $785 $1,422 n/a
SU0226 # 08 Y:2006 08 2006 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $53,622 $114,259 n/a
SU0226 # 09 Y:2006 09 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $321 $684 n/a
SU0226 # 10 Y:2006 10 2006 OPTIMIZE PLANT POWER FACTOR $5,381 $33,320 n/a
UD0721 # 01 Y:2005 01 2005 RECOVER MECHANICAL ENERGY $206,969 $413,938 Implemented
UD0721 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,010 $86,100 Implemented