Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
246
matching recommendationsNAICS | 331420 | Copper Rolling, Drawing, Extruding, and Alloying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0358 # 03 Y:2007 | 03 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,543 | $24,660 | Not Implemented |
NC0358 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $308 | $100 | Implemented |
NC0358 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $327 | $316 | Implemented |
NC0358 # 06 Y:2007 | 06 | 2007 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $767 | $1,000 | Not Implemented |
NC0358 # 07 Y:2007 | 07 | 2007 | USE PHOTOCELL CONTROLS | $187 | $200 | Not Implemented |
NC0358 # 08 Y:2007 | 08 | 2007 | MAINTAIN CLEAN CONDITIONS BEFORE PAINTING | $805,000 | $56,000 | Not Implemented |
MS0294 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $93,222 | $290,000 | Not Implemented |
MS0294 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,448 | $70,420 | Not Implemented |
MS0294 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,175 | $21,180 | Not Implemented |
MS0294 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,047 | $10,811 | Not Implemented |
MS0294 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,760 | $172 | Implemented |
MS0294 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,240 | $609 | Implemented |
MS0294 # 07 Y:2006 | 07 | 2006 | AIR CONDITION ONLY SPACE NECESSARY | $381 | $240 | Not Implemented |
SU0226 # 01 Y:2006 | 01 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $19,304 | $0 | n/a |
SU0226 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,426 | $0 | n/a |
SU0226 # 03 Y:2006 | 03 | 2006 | USE SYNTHETIC LUBRICANT | $5,978 | $0 | n/a |
SU0226 # 04 Y:2006 | 04 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,658 | $0 | n/a |
SU0226 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,300 | $770 | n/a |
SU0226 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,961 | $20,200 | n/a |
SU0226 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $785 | $1,422 | n/a |
SU0226 # 08 Y:2006 | 08 | 2006 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $53,622 | $114,259 | n/a |
SU0226 # 09 Y:2006 | 09 | 2006 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $321 | $684 | n/a |
SU0226 # 10 Y:2006 | 10 | 2006 | OPTIMIZE PLANT POWER FACTOR | $5,381 | $33,320 | n/a |
UD0721 # 01 Y:2005 | 01 | 2005 | RECOVER MECHANICAL ENERGY | $206,969 | $413,938 | Implemented |
UD0721 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,010 | $86,100 | Implemented |