Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
50
matching recommendationsNAICS | 33149 | Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, Extruding, and Alloying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0301 # 02 Y:2011 | 02 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,978 | $689 | Not Implemented |
SU0301 # 01 Y:2011 | 01 | 2011 | USE POWER DURING OFF-PEAK PERIODS | $4,632 | $0 | Not Implemented |
SU0266 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,096 | $424 | Implemented |
SU0266 # 01 Y:2008 | 01 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,391 | $0 | Not Implemented |
SU0266 # 02 Y:2008 | 02 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,817 | $0 | Not Implemented |
SU0266 # 03 Y:2008 | 03 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,166 | $0 | Implemented |
SU0266 # 04 Y:2008 | 04 | 2008 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $151,996 | $23,800 | Not Implemented |
SU0266 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,953 | $339 | Implemented |
SU0266 # 07 Y:2008 | 07 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $114 | $65 | Not Implemented |
SU0266 # 08 Y:2008 | 08 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,220 | $40,650 | Not Implemented |
SU0266 # 09 Y:2008 | 09 | 2008 | INSTALL OCCUPANCY SENSORS | $100 | $626 | Not Implemented |
SU0265 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $468 | $0 | Not Implemented |
SU0265 # 08 Y:2008 | 08 | 2008 | OPTIMIZE PLANT POWER FACTOR | $921 | $4,079 | Not Implemented |
SU0265 # 07 Y:2008 | 07 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $171 | $310 | Not Implemented |
SU0265 # 06 Y:2008 | 06 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,263 | $3,368 | Not Implemented |
SU0265 # 05 Y:2008 | 05 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $786 | $223 | Implemented |
SU0265 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,615 | $252 | Implemented |
SU0265 # 03 Y:2008 | 03 | 2008 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $214,622 | $23,800 | Not Implemented |
SU0265 # 02 Y:2008 | 02 | 2008 | USE SYNTHETIC LUBRICANT | $191 | $0 | Not Implemented |
SU0180 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $20,507 | $0 | Implemented |
SU0180 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,590 | $0 | Implemented |
SU0180 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,884 | $0 | Implemented |
SU0180 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $964 | $0 | Implemented |
SU0180 # 05 Y:2004 | 05 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,647 | $712 | Not Implemented |
SU0180 # 06 Y:2004 | 06 | 2004 | ADD AREA LIGHTING SWITCHES | $291 | $680 | Implemented |