IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 33149 Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, Extruding, and Alloying
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0351 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,704 $5,952 Implemented
UF0351 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,503 $0 Not Implemented
UF0351 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,480 $3,600 Not Implemented
UF0351 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,215 $35,243 Implemented
UF0351 # 06 Y:2004 06 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $16,846 $85,000 Not Implemented
UF0351 # 07 Y:2004 07 2004 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $225,920 $200,000 Not Implemented
UF0351 # 01 Y:2004 01 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,410 $1,004 Implemented
SU0180 # 06 Y:2004 06 2004 ADD AREA LIGHTING SWITCHES $291 $680 Implemented
SU0180 # 05 Y:2004 05 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,647 $712 Not Implemented
SU0180 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $964 $0 Implemented
SU0180 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,884 $0 Implemented
SU0180 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $13,590 $0 Implemented
SU0180 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,507 $0 Implemented
LE0176 # 07 Y:2004 07 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $985 $0 Not Implemented
LE0176 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,825 $0 Implemented
LE0176 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,003 $1,000 Implemented
LE0176 # 04 Y:2004 04 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,480 $5,000 Not Implemented
LE0176 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,851 $1,000 Not Implemented
LE0176 # 02 Y:2004 02 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $20,766 $1,500 Not Implemented
LE0176 # 01 Y:2004 01 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $114,214 $25,000 Implemented