IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143

matching recommendations
Reset
NAICS 331492 Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0274 # 04 Y:2008 04 2008 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,421 $4,680 Implemented
LE0274 # 05 Y:2008 05 2008 USE SYNTHETIC LUBRICANT $1,064 $500 Implemented
LE0274 # 06 Y:2008 06 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $189 $280 Implemented
LE0274 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,227 $18,236 Not Implemented
LE0274 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $1,642 $360 Not Implemented
MZ0007 # 01 Y:2007 01 2007 COVER OPEN TANKS $2,560 $0 Implemented
MZ0007 # 02 Y:2007 02 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $10,000 $20,000 Not Implemented
MZ0007 # 03 Y:2007 03 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $533 $0 Implemented
MZ0007 # 04 Y:2007 04 2007 DISCONNECT BALLASTS $27,567 $1,310 Implemented
MZ0007 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $5,535 $3,250 Implemented
UF0359 # 01 Y:2005 01 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,279 $0 Not Implemented
UF0359 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $839 $0 Not Implemented
UF0359 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $627 $0 Implemented
UF0359 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $448 $0 Implemented
UF0359 # 05 Y:2005 05 2005 $15,046 $0 Implemented
SU0180 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,507 $0 Implemented
SU0180 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $13,590 $0 Implemented
SU0180 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,884 $0 Implemented
SU0180 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $964 $0 Implemented
SU0180 # 05 Y:2004 05 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,647 $712 Not Implemented
SU0180 # 06 Y:2004 06 2004 ADD AREA LIGHTING SWITCHES $291 $680 Implemented
LE0176 # 01 Y:2004 01 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $114,214 $25,000 Implemented
LE0176 # 02 Y:2004 02 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $20,766 $1,500 Not Implemented
LE0176 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,851 $1,000 Not Implemented
LE0176 # 04 Y:2004 04 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,480 $5,000 Not Implemented