IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,045

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0254 # 05 Y:2018 05 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,499 $52,000 Implemented
MZ0254 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $384 $1,000 Implemented
MZ0254 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,370 $57,615 Implemented
UA0193 # 01 Y:2018 01 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $70,570 $200,000 Not Implemented
UA0193 # 02 Y:2018 02 2018 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $62,836 $165,000 Not Implemented
UA0193 # 03 Y:2018 03 2018 INSTALL COMMON HEADER ON COMPRESSORS $63,989 $119,600 Not Implemented
UA0193 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,960 $1,000 Implemented
UA0193 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $6,216 $1,912 Implemented
UA0193 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,080 $25,456 Not Implemented
NL0019 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,000 $23,000 Implemented
NL0019 # 02 Y:2018 02 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $9,412 $32,000 Not Implemented
NL0019 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,580 $0 Implemented
NL0019 # 04 Y:2018 04 2018 ELIMINATE/REDUCE AN OPERATION $5,000 $6,500 Not Implemented
UD0979 # 01 Y:2018 01 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,640 $0 Implemented
UD0979 # 02 Y:2018 02 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,096 $0 Not Implemented
UD0979 # 03 Y:2018 03 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $26,438 $4,500 Not Implemented
UD0979 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,299 $1,000 Implemented
UD0979 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,331 $6 Implemented
UD0979 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,206 $905 Implemented
UD0979 # 07 Y:2018 07 2018 UPGRADE CONTROLS ON COMPRESSORS $13,560 $30,000 Not Implemented
UD0979 # 08 Y:2018 08 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,917 $12,782 Implemented
UD0979 # 09 Y:2018 09 2018 USE OPTIMUM THICKNESS INSULATION $18,548 $984 Implemented
UD0979 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,834 $68,160 Implemented
UD0979 # 11 Y:2018 11 2018 ADD AREA LIGHTING SWITCHES $1,666 $130 Implemented
UD0979 # 12 Y:2018 12 2018 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $180,631 $300,000 Not Implemented