IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0251 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,085 $1,000 Implemented
LE0251 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,122 $194 Implemented
LE0251 # 06 Y:2007 06 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,198 $7,003 Not Implemented
LE0251 # 07 Y:2007 07 2007 OPTIMIZE PLANT POWER FACTOR $3,551 $4,650 Not Implemented
LE0251 # 08 Y:2007 08 2007 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,117 $1,500 Not Implemented
LE0251 # 09 Y:2007 09 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $758 $300 Not Implemented
SU0242 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $67 $432 Not Implemented
SU0242 # 09 Y:2006 09 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $126 $632 Implemented
SU0242 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $849 $1,005 Implemented
SU0242 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,530 $32,632 Implemented
SU0242 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,265 $524 Implemented
SU0242 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,673 $0 Implemented
SU0242 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $7,884 $0 Not Implemented
SU0242 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,294 $0 Not Implemented
SU0242 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $139,633 $0 Not Implemented
SU0242 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $12,811 $4,204 Implemented
LE0214 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $3,259 $2,300 Implemented
LE0214 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,575 $500 Implemented
LE0214 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,291 $640 Not Implemented
LE0214 # 03 Y:2005 03 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,017 $320 Implemented
LE0214 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,637 $5,500 Implemented
LE0214 # 01 Y:2005 01 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,742 $30,000 Not Implemented
LE0200 # 11 Y:2004 11 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $657 $380 Implemented
LE0200 # 10 Y:2004 10 2004 USE OPTIMUM THICKNESS INSULATION $768 $300 Implemented
LE0200 # 09 Y:2004 09 2004 IMPROVE COMBUSTION CONTROL CAPABILITY $857 $200 Implemented