IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0052 # 05 Y:2014 05 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,689 $608 Not Implemented
WM0052 # 06 Y:2014 06 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,489 $9,750 Not Implemented
WM0052 # 07 Y:2014 07 2014 INSULATE BARE EQUIPMENT $2,595 $2,500 Not Implemented
WM0052 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $391 $375 Implemented
WM0026 # 01 Y:2013 01 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $586 $424 Not Implemented
WM0026 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $1,319 $2,730 Not Implemented
WM0026 # 03 Y:2013 03 2013 AIR CONDITION ONLY SPACE NECESSARY $2,884 $0 Not Implemented
WM0026 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,454 $1,526 Implemented
WM0026 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $239 $410 Not Implemented
WM0026 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,054 $33,056 Implemented
WM0001 # 01 Y:2012 01 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $435 $200 Implemented
WM0001 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $362 $30 Implemented
WM0001 # 03 Y:2012 03 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $488 $0 Not Implemented
WM0001 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,696 $0 Not Implemented
WM0001 # 05 Y:2012 05 2012 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $27,100 $78,000 Not Implemented
WM0001 # 06 Y:2012 06 2012 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $236 $79 Not Implemented
WM0001 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $1,000 Implemented
WM0001 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,227 $1,535 Implemented
IC0128 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,654 $1,710 Implemented
IC0128 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $10,523 $6,000 Not Implemented
IC0128 # 03 Y:2007 03 2007 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $25,162 $21,540 Implemented
IC0128 # 04 Y:2007 04 2007 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $103,122 $9,600 Not Implemented
IC0128 # 05 Y:2007 05 2007 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $44,610 $0 Not Implemented
IC0128 # 06 Y:2007 06 2007 IMPROVE SPACE COMFORT CONDITIONING $11,886 $10,408 Not Implemented
IC0128 # 07 Y:2007 07 2007 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $21,900 $5,883 Implemented