IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,045

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0553 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,980 $9,830 Not Implemented
MA0553 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,977 $12,543 Implemented
MA0553 # 05 Y:2004 05 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,918 $1,039 Not Implemented
MA0553 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,228 $600 Implemented
MA0553 # 07 Y:2004 07 2004 INSULATE FEEDWATER TANK $910 $550 Implemented
UD0696 # 01 Y:2004 01 2004 AUTOMATE FINISHING PROCESS $50,850 $28,500 Not Implemented
UD0696 # 02 Y:2004 02 2004 COVER OPEN TANKS $19,683 $2,870 Not Implemented
UD0696 # 03 Y:2004 03 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $11,250 $0 Not Implemented
UD0696 # 04 Y:2004 04 2004 ELIMINATE/REDUCE AN OPERATION $9,375 $0 Implemented
UD0696 # 05 Y:2004 05 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,026 $2,405 Not Implemented
UD0696 # 06 Y:2004 06 2004 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $6,615 $13,230 Not Implemented
UD0696 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,891 $600 Implemented
UD0696 # 08 Y:2004 08 2004 IMPROVE COMBUSTION CONTROL CAPABILITY $1,617 $0 Implemented
UD0696 # 09 Y:2004 09 2004 DISCONNECT BALLASTS $1,218 $53 Not Implemented
UD0696 # 10 Y:2004 10 2004 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $845 $0 Implemented
UD0696 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $631 $486 Implemented
UD0696 # 12 Y:2004 12 2004 REDUCE VENTILATION AIR $1,416 $0 Not Implemented
MA0549 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $32,668 $15,495 Implemented
MA0549 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,739 $8,525 Not Implemented
MA0549 # 03 Y:2004 03 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,668 $2,066 Not Implemented
MA0549 # 04 Y:2004 04 2004 IMPROVE COMBUSTION CONTROL CAPABILITY $8,653 $16,100 Implemented
MA0549 # 05 Y:2004 05 2004 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $5,232 $11,500 Not Implemented
MA0549 # 06 Y:2004 06 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,412 $0 Implemented
MA0549 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,794 $315 Implemented
MA0549 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $1,041 $896 Implemented