IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0127 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $444 $240 Not Implemented
BS0127 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,465 $10,665 Not Implemented
BS0127 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,969 $1,830 Not Implemented
BS0127 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,701 $2,200 Not Implemented
BS0127 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,941 $9,000 Not Implemented
BS0127 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,976 $50 Not Implemented
TT0226 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,740 $2,000 Implemented
TT0226 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,194 $4,515 Not Implemented
TT0226 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,163 $30,000 Not Implemented
TT0226 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,879 $82,992 Implemented
TT0226 # 04 Y:2019 04 2019 UPGRADE OBSOLETE EQUIPMENT $24,351 $64,000 Not Implemented
TT0226 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $31,634 $2,200 Not Implemented
TT0226 # 02 Y:2019 02 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $111,520 $54,000 Not Implemented
TT0226 # 01 Y:2019 01 2019 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $1,033,923 $50,000 Not Implemented
MA0799 # 06 Y:2019 06 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,202 $5,200 Not Implemented
MA0799 # 04 Y:2019 04 2019 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,709 $2,500 Implemented
MA0799 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,442 $14,461 Implemented
MA0799 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,506 $138,640 Not Implemented
MA0799 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,784 $4,000 Implemented
MA0799 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,826 $47,870 Not Implemented
NL0029 # 02 Y:2019 02 2019 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $11,970 $4,500 Not Implemented
NL0029 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $393 $1,500 Implemented
NL0029 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,632 $18,300 Implemented
LE0467 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,568 $30,054 Implemented
LE0467 # 06 Y:2019 06 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,352 $35,000 Not Implemented