IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0476 # 11 Y:2015 11 2015 INSTALL OCCUPANCY SENSORS $7,038 $21,100 Implemented
SF0476 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,239 $121,403 Implemented
SF0476 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,324 $215 Implemented
SF0476 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,722 $386 Implemented
SF0476 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $8,163 $913 Implemented
SF0476 # 03 Y:2015 03 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,817 $0 Implemented
SF0476 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,100 $280 Implemented
SF0476 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,871 $0 Implemented
MZ0193 # 03 Y:2015 03 2015 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $62,777 $37,500 Implemented
MZ0193 # 02 Y:2015 02 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,714 $1,160 Implemented
MZ0193 # 01 Y:2015 01 2015 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $21,804 $700 Implemented
UA0149 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,435 $41,578 Implemented
UA0149 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,942 $3,180 Implemented
BS0065 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,088 $160 Implemented
BS0065 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $148 $15 Implemented
BS0065 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,229 $46,340 Implemented
UA0144 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,659 $2,995 Implemented
UA0144 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,060 $800 Implemented
AM0682 # 10 Y:2015 10 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $150 $0 Implemented
AM0682 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $170 $200 Implemented
AM0682 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $211 $75 Implemented
AM0682 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $585 $5 Implemented
AM0682 # 05 Y:2015 05 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,840 $1,790 Implemented
AM0682 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,480 $1,000 Implemented
UM0457 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $162,816 $1,000 Implemented