IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0992 # 05 Y:2018 05 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,174 $9,900 Not Implemented
UD0992 # 01 Y:2018 01 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $14,245 $700 Implemented
UD0992 # 02 Y:2018 02 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $48,158 $1,000 Not Implemented
UD0992 # 03 Y:2018 03 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $30,337 $32,600 Not Implemented
UD0992 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,815 $0 Not Implemented
AS0457 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,791 $19,647 Not Implemented
AS0457 # 02 Y:2018 02 2018 USE SOLAR HEAT FOR HEAT $7,441 $1,961 Not Implemented
AS0457 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,174 $0 Implemented
AS0457 # 04 Y:2018 04 2018 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $4,539 $2,530 Not Implemented
AS0457 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $2,412 $2,750 Not Implemented
AS0457 # 06 Y:2018 06 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,736 $7,600 Not Implemented
AS0457 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,832 $676 Implemented
UD0989 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,033 $0 Not Implemented
UD0989 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,012 $0 Not Implemented
UD0989 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,291 $1,000 Not Implemented
UD0989 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $1,362 $1,935 Not Implemented
UD0989 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,885 $6,000 Not Implemented
IC0206 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,708 $1,690 Not Implemented
IC0206 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $244 $191 Not Implemented
IC0206 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,299 $2,713 Not Implemented
IC0206 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,289 $750 Not Implemented
IC0206 # 03 Y:2018 03 2018 USE RADIANT HEATER FOR SPOT HEATING $2,158 $3,396 Not Implemented
IC0206 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,280 $290 Not Implemented
MZ0254 # 05 Y:2018 05 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,499 $52,000 Implemented
MZ0254 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $384 $1,000 Implemented