IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,047

matching recommendations
Reset
NAICS 33151 Ferrous Metal Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0277 # 01 Y:2005 01 2005 REDUCE SCRAP PRODUCTION $34,320 $7,500 Implemented
UM0277 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,442 $1,000 Implemented
UM0277 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,729 $3,000 Not Implemented
UM0277 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,247 $1,000 Implemented
LM0091 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $709 $300 Implemented
LM0091 # 02 Y:2005 02 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $1,029 $683 Implemented
LM0091 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $764 $240 Implemented
LM0091 # 04 Y:2005 04 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $28,000 $1,260 Not Implemented
LM0091 # 05 Y:2005 05 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,750 $200 Implemented
LM0091 # 06 Y:2005 06 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $16,875 $2,150 Implemented
LM0091 # 07 Y:2005 07 2005 MOVE PRODUCT USING MECHANICAL MEANS $16,875 $1,600 Implemented
LE0197 # 01 Y:2004 01 2004 AUTOMATE FINISHING PROCESS $269,280 $300,000 Implemented
LE0197 # 02 Y:2004 02 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $55,434 $60,000 Implemented
LE0197 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $52,852 $10,000 Implemented
LE0197 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,606 $2,484 Implemented
LE0197 # 05 Y:2004 05 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $35,862 $150,000 Not Implemented
LE0197 # 06 Y:2004 06 2004 INSULATE FEEDWATER TANK $22,098 $50,000 Not Implemented
LE0197 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $864 $840 Implemented
MA0553 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $41,580 $20,000 Not Implemented
MA0553 # 02 Y:2004 02 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,555 $15,605 Implemented
MA0553 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,980 $9,830 Not Implemented
MA0553 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,977 $12,543 Implemented
MA0553 # 05 Y:2004 05 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,918 $1,039 Not Implemented
MA0553 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,228 $600 Implemented
MA0553 # 07 Y:2004 07 2004 INSULATE FEEDWATER TANK $910 $550 Implemented