IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,047

matching recommendations
Reset
NAICS 33151 Ferrous Metal Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0220 # 05 Y:2020 05 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $183,880 $820,000 Not Implemented
UA0220 # 06 Y:2020 06 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,885 $9,300 Not Implemented
BS0127 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $444 $240 Not Implemented
BS0127 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,465 $10,665 Not Implemented
BS0127 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,969 $1,830 Not Implemented
BS0127 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,701 $2,200 Not Implemented
BS0127 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,941 $9,000 Not Implemented
BS0127 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,976 $50 Not Implemented
TT0226 # 01 Y:2019 01 2019 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $1,033,923 $50,000 Not Implemented
TT0226 # 02 Y:2019 02 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $111,520 $54,000 Not Implemented
TT0226 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $31,634 $2,200 Not Implemented
TT0226 # 04 Y:2019 04 2019 UPGRADE OBSOLETE EQUIPMENT $24,351 $64,000 Not Implemented
TT0226 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,879 $82,992 Implemented
TT0226 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,163 $30,000 Not Implemented
TT0226 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,194 $4,515 Not Implemented
TT0226 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,740 $2,000 Implemented
NL0029 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,632 $18,300 Implemented
NL0029 # 02 Y:2019 02 2019 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $11,970 $4,500 Not Implemented
NL0029 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $393 $1,500 Implemented
AM0768 # 01 Y:2019 01 2019 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,120 $0 Implemented
AM0768 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,730 $1,000 Implemented
AM0768 # 03 Y:2019 03 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,910 $0 Implemented
AM0768 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $3,900 Not Implemented
AM0768 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,070 $13 Implemented
AM0768 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $615 Not Implemented