IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

62

matching recommendations
Reset
NAICS 33151 Ferrous Metal Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0242 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $139,633 $0 Not Implemented
SU0242 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,294 $0 Not Implemented
SU0242 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $7,884 $0 Not Implemented
SU0242 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,673 $0 Implemented
SU0242 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $12,811 $4,204 Implemented
SU0242 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,265 $524 Implemented
SU0242 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,530 $32,632 Implemented
SU0242 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $849 $1,005 Implemented
SU0242 # 09 Y:2006 09 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $126 $632 Implemented
SU0242 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $67 $432 Not Implemented
UD0749 # 07 Y:2006 07 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $111,197 $15,000 Not Implemented
UD0749 # 13 Y:2006 13 2006 USE MINIMUM SAFE OVEN VENTILATION $4,400 $0 Implemented
UD0749 # 10 Y:2006 10 2006 INSTALL TIMERS AND/OR THERMOSTATS $22,598 $20,000 Implemented
UD0749 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,896 $13,819 Not Implemented
UD0749 # 11 Y:2006 11 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,254 $0 Implemented
UD0749 # 09 Y:2006 09 2006 UPGRADE CONTROLS ON COMPRESSORS $25,009 $45,000 Implemented
UD0749 # 03 Y:2006 03 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $211,000 $7,200 Implemented
UD0749 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $98,501 $34,560 Implemented
UD0749 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $128,436 $44,181 Implemented
UD0749 # 06 Y:2006 06 2006 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $127,000 $20,000 Not Implemented
UD0749 # 04 Y:2006 04 2006 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $151,097 $0 Not Implemented
UD0749 # 02 Y:2006 02 2006 REDUCE VENTILATION AIR $359,088 $0 Not Implemented
UD0749 # 01 Y:2006 01 2006 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $973,467 $1,500,000 Not Implemented
UM0307 # 01 Y:2006 01 2006 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $302,929 $70,000 Implemented
UM0307 # 10 Y:2006 10 2006 INSULATE BARE EQUIPMENT $3,606 $1,191 Implemented