IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
Reset
NAICS 331511 Iron Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0353 # 09 Y:2013 09 2013 ADJUST BURNERS FOR EFFICIENT OPERATION $1,051,434 $5,225,000 Not Implemented
LE0353 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $786 $3,495 Implemented
LE0353 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,972 $8,105 Implemented
LE0353 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,998 $11,700 Implemented
LE0353 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $15,964 $6,384 Not Implemented
LE0353 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,843 $520 Implemented
LE0353 # 08 Y:2013 08 2013 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $1,196 $2,200 Implemented
LE0353 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,835 $1,000 Implemented
LE0353 # 05 Y:2013 05 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,908 $2,800 Not Implemented
LE0329 # 02 Y:2011 02 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $50,301 $8,250 Not Implemented
LE0329 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,298 $1,000 Not Implemented
LE0329 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,539 $30,000 Not Implemented
LE0329 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,228 $86,000 Not Implemented
LE0329 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,610 $25,300 Not Implemented
DL0069 # 02 Y:2011 02 2011 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $36,000 $1,000 Implemented
DL0069 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,000 $11,000 Not Implemented
DL0069 # 04 Y:2011 04 2011 COVER OPEN TANKS $36,600 $9,390 Not Implemented
DL0069 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $60,000 $30,000 Not Implemented
DL0069 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $95,600 $21,215 Not Implemented
DL0069 # 01 Y:2011 01 2011 REDUCE VENTILATION AIR $96,600 $149,350 Implemented
LE0279 # 08 Y:2008 08 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,871 $3,000 Implemented
LE0279 # 13 Y:2008 13 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,231 $29,927 Not Implemented
LE0279 # 09 Y:2008 09 2008 $3,632 $600 Implemented
LE0279 # 03 Y:2008 03 2008 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $13,078 $40 Implemented
LE0279 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $13,105 $26,600 Not Implemented