IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

441

matching recommendations
Reset
NAICS 33152 Nonferrous Metal Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0296 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $22,207 $1,640 Implemented
TT0296 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,264 $1,920 Implemented
TT0296 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,690 $8,100 Implemented
TT0296 # 06 Y:2023 06 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $81,000 $60,000 Implemented
UF0595 # 10 Y:2023 10 2023 IMPROVE SPACE COMFORT CONDITIONING $20,697 $4,480 Implemented
UF0595 # 07 Y:2023 07 2023 INSTALL SUB-METERING EQUIPMENT $1,589 $4,340 Implemented
UF0595 # 08 Y:2023 08 2023 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,317 $5,838 Implemented
UF0595 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,458 $356 Implemented
UF0595 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $1,092 $2,160 Implemented
UF0595 # 06 Y:2023 06 2023 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,957 $3,276 Implemented
UF0595 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $39,683 $20,785 Implemented
UF0595 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,931 $25,400 Implemented
TT0271 # 06 Y:2022 06 2022 ADJUST BURNERS FOR EFFICIENT OPERATION $1,316 $1,500 Implemented
TT0271 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,479 $1,500 Implemented
TT0271 # 03 Y:2022 03 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $3,012 $0 Implemented
TT0271 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,410 $3,000 Implemented
TT0271 # 10 Y:2022 10 2022 UPGRADE CONTROLS ON COMPRESSORS $237 $600 Implemented
TT0271 # 09 Y:2022 09 2022 INSTALL TIMERS AND/OR THERMOSTATS $435 $200 Implemented
MZ0319 # 02 Y:2021 02 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,278 $240 Implemented
MZ0319 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $687 $800 Implemented
MZ0319 # 05 Y:2021 05 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,286 $480 Implemented
AM0834 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $363 $0 Implemented
AM0834 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $620 $410 Implemented
MZ0319 # 08 Y:2021 08 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,401 $25,720 Implemented
AM0834 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,400 $1,000 Implemented