IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

437

matching recommendations
Reset
NAICS 33152 Nonferrous Metal Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0095 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,134 $5,290 Implemented
MZ0095 # 03 Y:2012 03 2012 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $688 $0 Implemented
UM0402 # 01 Y:2012 01 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,681 $200 Implemented
UM0402 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,300 $200 Implemented
UM0402 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,496 $2,000 Implemented
MZ0081 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,034 $860 Implemented
MZ0081 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $4,444 $4,000 Implemented
MZ0081 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $9,628 $8,667 Implemented
MZ0081 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $11,110 $9,100 Implemented
MZ0081 # 05 Y:2012 05 2012 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $58,850 $120,000 Implemented
MZ0081 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,137 $1,700 Implemented
MZ0081 # 07 Y:2012 07 2012 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $0 $0 Implemented
UA3015 # 01 Y:2011 01 2011 REPAIR OR REPLACE STEAM TRAPS $1,604 $3,770 Implemented
UA3015 # 02 Y:2011 02 2011 REPAIR AND ELIMINATE STEAM LEAKS $3,000 $1,280 Implemented
UA3015 # 03 Y:2011 03 2011 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $3,571 $2,440 Implemented
BD0381 # 02 Y:2010 02 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $24,197 $70,000 Implemented
BD0381 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,634 $40 Implemented
BD0381 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,137 $2,500 Implemented
BD0381 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $2,065 $1,350 Implemented
BD0381 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,069 $725 Implemented
BD0381 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $812 $2,060 Implemented
BD0381 # 10 Y:2010 10 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $591 $1,900 Implemented
MA0647 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,543 $1,200 Implemented
SD0412 # 03 Y:2009 03 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,233 $13,039 Implemented
SD0412 # 05 Y:2009 05 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,333 $0 Implemented