IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

971

matching recommendations
Reset
NAICS 33152 Nonferrous Metal Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0079 # 07 Y:2017 07 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,652 $1,239 Not Implemented
IP0079 # 08 Y:2017 08 2017 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $742 $90 Implemented
IP0079 # 09 Y:2017 09 2017 APPLY FOR INVESTMENT INCENTIVES $38,196 $5,000 Implemented
IP0079 # 10 Y:2017 10 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,415 $9,367 Not Implemented
IP0079 # 11 Y:2017 11 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,761 $2,448 Not Implemented
IP0079 # 12 Y:2017 12 2017 OPTIMIZE PLANT POWER FACTOR $23,934 $35,575 Implemented
IP0079 # 13 Y:2017 13 2017 APPLY FOR INVESTMENT INCENTIVES $2,977 $5,000 Implemented
IP0079 # 14 Y:2017 14 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,861 $3,300 Not Implemented
IP0079 # 15 Y:2017 15 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,112 $79,976 Not Implemented
LE0428 # 06 Y:2017 06 2017 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,118 $10,500 Implemented
LE0428 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $769 $3,192 Implemented
LE0428 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,863 $10,608 Implemented
LE0428 # 03 Y:2017 03 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,953 $9,500 Not Implemented
LE0428 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $340 $800 Not Implemented
LE0428 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,923 $1,000 Implemented
IA0563 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,138 $37,931 Implemented
IA0563 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $8,696 $7,568 Not Implemented
IA0563 # 03 Y:2016 03 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,852 $13,275 Implemented
IA0563 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,656 $560 Implemented
IA0563 # 05 Y:2016 05 2016 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,962 $4,050 Not Implemented
IA0563 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,484 $700 Implemented
IA0563 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,182 $1,900 Implemented
IA0563 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $570 $2,800 Implemented
OR0671 # 01 Y:2016 01 2016 ELIMINATE/REDUCE AN OPERATION $357,967 $669,217 Not Implemented
OR0671 # 02 Y:2016 02 2016 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $190,362 $300,000 Not Implemented